Adventure Cycling Association Forum

Bicycle Travel => Temporary ACA Route Road Closures => Topic started by: bigK12603 on April 05, 2018, 12:34:34 pm

 
Title: Atlantic Coast Route section 2 map 19 - construction April 2018
Post by: bigK12603 on April 05, 2018, 12:34:34 pm
RE:Walkway Over The Hudson west end - visitor center construction

the entire west end is now closed off for construction - there is a fenced path to Haviland Rd. twn. of Lloyd Ulster county NY - SB (to New Paltz) at Haviland Rd. RIGHT then another RIGHT into the Hudson Valley RT parking lot then LEFT onto the RT -NB RIGHT off the RT CAUTION! downhill grade through the parking lot then LEFT onto Haviland Rd. and LEFT at temp entrance through the fenced path then RIGHT onto the Walkway proper

the visitor center is to be opened May 20