The bridge is passable as of 7/31/2011.

2
We ignored the detour signs and easily walked our bikes past all the bridge construction happening along the TransAm route Section 9. They have a temporary bridge at all of the crossings that the workers use.  They happily waved us on.  We walked past the bridge reconstruction between Walnut Grove and Fair Grove on 8/1/2011 and the two bridges being reconstructed between Marshfield and Hartville on 8/2/2011.  We have not seen any other detours so far from Girrard to Farmington.