Hey Peter,
I'll also be touring around that time. I'm leaving from Florence, OR on April 2nd and riding to San Diego. I'm planning on averaging around 50 miles a day.
Assuming all the other road closures are fixed by then but the bridge is still closed I don't think there is a feasible way to make it around the bridge. The only thing I've found mentioned is the Pine Ridge trail in Pfieffer Big Sur State Park right by the Ranger Station, but that doesn't look doable by bicycle at all.
There is some talk of them making a trail for pedestrians to get by. I would think that would be passable if it actually happens.
"The Fire Brigade and OES are actively working with the State Park and private land owners to try and identify the possibility of putting in a trail around the bridge. Our plan is to look at the State park area on Tuesday when hopefully the rain stops."
Here is my alternate route if I have to skip Big Sur:
https://ridewithgps.com/routes/19098798
Hi Opus
Thanks for the alternative route. I hope we don't need to use it. From what you say, you will probably be going through about 10 days ahead of me.
I agree that the slides should all be clear by April, the real concern is the bridge.
On Google maps there do appear to be some alternative tracks, so hopefully the Fire Brigade can negotiate a route with the landowners.
I have also posted on the local newspaper site, asking if anyone knows a route round the bridge, if I get anything back, I will post it on here.
I really don't want to miss Big Sur! Last time I did this journey was by car in 2008, and Big Sur was closed then due to the fires.
Thanks again
Peter