Show Posts

This section allows you to view all posts made by this member. Note that you can only see posts made in areas you currently have access to.


 

Messages - jrobertson

Pages: 1 2 3 [4]
46
We have been advised that the Construction on US 50 in this area is now complete. Please remember that this is not the official ACA route, and there is still a dangerous overpass on this section. See the addenda and alternate route map to avoid this overpass.



-Jamie Robertson
Routes and Mapping

47
A construction project for an electric bus line in Albuquerque is starting and will make the section on the west end of the 'Albuquerque Detail' map and Map panel 65 cumbersome with possible construction debris. The optimistic completion date is 'sometime in 2017'. A better route around this construction can be viewed on a map here:

https://drive.google.com/open?id=1EfBCGBQ4GZWFjjjXLBTxlwO8n-M&usp=sharing

WB:

Turn right onto Paseo Del Bosque Trail - 0.316 mi
Turn left to stay on Paseo Del Bosque Trail - 279 ft
Turn left to stay on Paseo Del Bosque Trail - 167 ft
Turn right - 0.769 mi
Turn right toward Atrisco Dr NW - 433 ft
Turn right onto Atrisco Dr NW - 1,240 ft
Turn left to stay on Atrisco Dr NW - 0.443 mi
Turn right onto Palisades Dr NW - 0.639 mi
Continue onto Yucca Dr NW - 1,125 ft
Turn right onto Bluewater Rd NW - 0.921 mi
Turn left onto Airport Dr NW - 0.453 mi

EB:

Head north on Airport Dr NW toward Bluewater Rd NW - 0.453 mi
Turn right onto Bluewater Rd NW - 0.921 mi
Turn left onto Yucca Dr NW - 1,125 ft
Continue onto Palisades Dr NW - 0.639 mi
Turn left onto Atrisco Dr NW - 0.443 mi
Turn right to stay on Atrisco Dr NW - 571 ft
Turn left toward Atrisco Dr NW - 82 ft
Continue onto Atrisco Dr NW - 587 ft
Turn left - 433 ft
Turn left - 0.769 mi
Turn left onto Paseo Del Bosque Trail - 167 ft
Turn right to stay on Paseo Del Bosque Trail - 279 ft
Turn right to stay on Paseo Del Bosque Trail - 0.316 mi

-Jamie Robertson
Cartographer
ACA Routes and Mapping

48
It has been brought to our attention that there is a section of construction from Thetford Center (turn E) to East Thetford (turn G) is under construction. It is passable, but currently dirt.

-Jamie Robertson
ACA Routes and Mapping team

49
There is a sinkhole affecting SR 146 in Hardin County Illinois just West of Elizabethtown. This affects  Trans Am Section 10 Map 117 and Great Rivers South Section 2, Map 18. The road is currently closed. The Illinois DOT is putting gravel into the sinkhole to try to fill it up but it is not safe to cross. There is a detour in place but it might be fairly long. A partially gravel alternate appears to be available just north of SR 146/34 using CR 435N and 185E. See images below.





50
Hello - We just got a call from a generous person in DeRidder (Map 73, just east of Merryville) who has a room for cyclists to stay who are being impacted by the flooding to the west. Her name is Mandie and can be reached at 803-565-3037. She is just off of highway 190 in DeRidder at 204 Honey Suckle St. It is unclear how long highway 190 will be closed, but Mandie thought it could be for 2-3 months.

Pages: 1 2 3 [4]