Show Posts

This section allows you to view all posts made by this member. Note that you can only see posts made in areas you currently have access to.


 

Topics - CMajernik

Pages: 1 2 [3] 4 5 ... 7
31
The Arrastra Fire is located north of Lincoln along Beaver Creek Rd./FR 4106 and Huckleberry Pass is closed as of July 21. The estimate is that it will be closed for at least 2 weeks. The detour is to ride State Hwy. 200. Some portions of the highway are winding with sharp turns and have minimal shoulders so ride defensively.

For more information see https://inciweb.nwcg.gov/incident/5390/

32
Four bridges are due to be replaced on the Big Sheep Creek Backcountry Byway (miles 73.5 - 90.3). The road closure is from Monday, July 17 to Monday, August 14.
Southbound detour: At mile 33.3, ride east for 5.4 mi. on State Hwy. 324. Bear right onto dirt/gravel Old Armstead Rd. (This road stays south of the Clark Canyon Reservoir). In 6.0 mi., turn right onto paved Red Rock Rd. N. In 2.8 mi., cross under I-15 and continue south on the frontage road on the east side of I-15. In 13.4 mi., you reach the town of Dell. Cross under I-15 and ride south on the frontage road on the west side of I-15. In 1.5 mi., rejoin the route at mile 90.3.

33
Construction will be occurirng to repair and/or replace three bridges on the Historic Columbia River Highway (US 30) between Mosier and The Dalles. Work includes repair of the historic Mosier Creek and Dry Canyon Creek bridges and a complete replacement of the Chenoweth Creek Bridge.

Work will begin in late June. For repair of the Mosier Creek and Dry Canyon bridges, expect single lane closures and delays up to 20 minutes.

The replacement of Chenoweth Creek Bridge, located approximately ¼ mile north of The Dalles City limits, will require a full closure of US 30 at the bridge from August 1 - 21st. Traffic will be detoured via Exit 76, Rowena.
Construction will be complete by the end of November, 2017.

34
The Utah DOT has closed Highway 143 between Parowan and Panguitch -
which includes the section traversed by Utah Cliffs.

Details: Fire Affecting Roadway SR 143 between MP 3 and 50 (S of Panguitch) Iron Co.
Closed Both Directions, Use Alt Route
Last Updated: 06/23/17 07:20 PM

A detour is available by continuing on Hwy 14 east from Cedar City to US 89
Then take US 89 north the Hwy 12 turn-off to Bryce.
(Read in reverse for westbound . . .)
You may wish to take a few extra miles to resupply at Panguitch.

Updates: https://inciweb.nwcg.gov/incident/5253/

35
Just before the intersection of Clay Pike Rd. and Spry Rd./Wolfe Run Rd. work on bridge reconstruction over Salt Creek will close the road. It will be closed from June 26 for 70 days through September 3.

EB detour: At turn C, continue on Chandlersville Rd./SR 146. In 9 mi., turn left onto SR 313. In 5.5 mi., rejoin route at turn E.
WB detour: At turn E, continue on SR 313. In 5.5 mi., turn right onto Chandlersville Rd./SR 146. In 9 mi., rejoin route at turn C.   


36
On map 39, in Oklahoma City, near turn B, NE 50th St. is closed at the I-235 overpass. Construction is occurring on ramp accesses. Here's a detour:
Eastbound: from turn B, turn left/west onto NE 50th St. In 0.3 mi., turn right/north onto N. Western Ave. In 1 mi., turn right/east onto NW 63rd St. In 3 mi., at the intersection of NW 63rd St. and N. Martin Luther King Ave., turn left and rejoin the route.
Westbound: At the intersection of N. Martin Luther King Ave. and NW 63rd St., turn right/west onto NW 63rd St. In 3 mi., turn left/south onto N. Western Ave. In 1 mi., turn left/east onto NW 50th St. In 0.3 mi., at turn B, turn right onto Shartel Ave. and rejoin the route.       

37
The I-90 interchange at turn B is under construction. The work is scheduled to be complete at the end of 2016. From the MN DOT: Pedestrians and cyclists travelling on the Northern Tier and the Mississippi River Trail will be detoured along the Apple Blossom Trail during the construction of the new interchange. The detour is to remain in place until further notice and circumvents the current Mississippi River Trail corridor from La Crescent to approximately 5.5 miles north of Dakota. http://www.dot.state.mn.us/dresbachbridge/index.html​

38
The Little Miami Scenic Trail will be closed between Senior Road in Morrow and Route 350 in Oregonia from September 12 through the end of November, 2016. No detour is available. The trail will be open for planned event participants only on certain weekends.
The closure in this area near Fort Ancient is due to erosion of the Little Miami River riverbank as its course has changed to undercut the trail berm. The Ohio Department of Natural Resources is responsible for the remediation which includes stabilizing the bank and building a small bridge over the affected area to accommodate trail use while allowing natural changes in the course of the river.
For updates on all trail closures please see the Friends of the Little Miami State Park website: www.littlemiamistatepark.org.

39
The Berry fire has closed Grassy Lake Rd./FR 261 from the east side of Targhee National Forest (mile 231.7) through to Flagg Ranch (mile 265.6). For updates go to: http://inciweb.nwcg.gov/incident/4954/

To avoid the fire there are 2 detours and both are extensive. #1: from mile 183.6 you can head north, then east on US 20 to West Yellowstone and go through Yellowstone National Park to the south entrance where you will rejoin the route. But fires within the Park have made the area very smoky. #2: from mile 221.7 you can work your way south on county roads, State Hwys. 32 and 33 through Tetonia, Driggs and Victor over Teton Pass into Jackson, WY where you can join the Jackson Spur.

40
Ellicott City had a major flood on 7/30/16. Main St./SR 144 is temporarily closed. Follow the posted detour around the town. For more information: https://www.facebook.com/hocogov/

41
Due to extensive sewer line replacement construction on Dr. Martin Luther King, Jr. Drive in Albuquerque this road is temporarily impassible in both directions. Fortunately there is an excellent alternative, which is shown in Ride with GPS. Eastbound: https://ridewithgps.com/routes/15956205
Westbound: https://ridewithgps.com/routes/15954386

42
The Franklin Ave bridge is closed till Fall of 2016.
See link for detour routes: http://www.hennepin.us/residents/transportation/franklin-ave-bridge

43
SR 230 from turn A to Riverside, WY is under construction. This ten miles has been ripped up and will be repaved. It's rideable but it feels like riding on a rumble strip. The shoulder is ripped up asphalt that has been tamped down with loose and large gravel. Ride carefully and consider hitching a ride in a pickup if possible. The construction project will be completed October 2016.

44
On map 14, traffic at the intersection of Grand Ave./US 60 and Bell Rd. will be re-routed due to bridge construction. The road closure begins April 1, 2016 and is expected to last 6-8 months. Here is a detour. It includes riding on smaller residential streets but the larger arterials will have increased traffic:
EB: Ride under SR 303. In 2.4 mi., turn left onto Meeker Blvd. In 0.1 mi., turn right onto W. Summerstart Dr. In 0.9 mi., turn right onto W. Aleppo Dr. In 0.6 mi., turn right onto N. Spanish Garden Dr. In 0.8 mi., turn right onto W. Whispering Oaks Dr. In 0.5 mi., turn right onto RH Johnson Blvd. In 0.3 mi., at light, cross Bell Rd. which becomes N. Nash St. In 0.9 mi., turn left onto W. Santa Fe Dr. In 0.3 mi., turn right onto Greenway Blvd. Cross railroad. At light, turn left onto Grand Ave./US 60 and rejoin route.
WB: At intersection of of 111th Ave. and Grand Ave./US 60, turn right onto Grand Ave./US 60. In 2.3 mi., turn right onto Greenway Blvd. Cross railroad and turn left onto W. Santa Fe Dr. In 0.3 mi., turn right onto N. Nash St. In 0.8 mi., road becomes RH Johnson Blvd. Cross Bell Rd. In 0.3 mi., turn left onto W. Whispering Oaks Dr. In 0.5 mi., turn left onto N. Spanish Garden Dr. In 0.8 mi., turn left onto W. Aleppo Dr. In 0.6 mi., turn left onto W. Summerstart Dr. In 0.9 mi., turn left onto Meeker Blvd. In 0.1 mi., at light, turn right onto Grand Ave./US 60 and rejoin route.       

To get updates here is a link:
http://azdot.gov/projects/phoenix-metro-area/us-60-(grand-ave)-and-bell-road-interchange/construction-updates

45
On SR 9 between Kremmling and Silverthorne, road construction is occurring between mile markers 126 to 131 (south of Green Mountain Reservoir). Expect delays Mondays - Fridays. Info: 970-724-4724. It is recommended to use the following detour. It has a climb/descent over Ute Pass and 12.6 miles of hard packed dirt. It was reported in 2015 that the surface is fine even for 23c/1 inch road tires:

Southbound, at Parshall on map 66, head south on paved Williams Fork Reservoir Rd./CR 3. In 4.5 miles, the road turns to hard packed dirt. Ride 12.6 miles and bear right at junction onto paved road toward Ute Pass. In 9.3 miles, turn left onto SR 9.
Northbound, at CR 15 on map 67, turn right toward Ute Pass. In 9.3 miles, bear left onto unpaved CR 3. In 12.6 miles, the road turns to pavement. In 4.5 miles, you reach Parshall and turn right onto US 40.   


Pages: 1 2 [3] 4 5 ... 7