On map 14, traffic at the intersection of Grand Ave./US 60 and Bell Rd. will be re-routed due to bridge construction. The road closure begins April 1, 2016 and is expected to last 6-8 months. Here is a detour. It includes riding on smaller residential streets but the larger arterials will have increased traffic:
EB: Ride under SR 303. In 2.4 mi., turn left onto Meeker Blvd. In 0.1 mi., turn right onto W. Summerstart Dr. In 0.9 mi., turn right onto W. Aleppo Dr. In 0.6 mi., turn right onto N. Spanish Garden Dr. In 0.8 mi., turn right onto W. Whispering Oaks Dr. In 0.5 mi., turn right onto RH Johnson Blvd. In 0.3 mi., at light, cross Bell Rd. which becomes N. Nash St. In 0.9 mi., turn left onto W. Santa Fe Dr. In 0.3 mi., turn right onto Greenway Blvd. Cross railroad. At light, turn left onto Grand Ave./US 60 and rejoin route.
WB: At intersection of of 111th Ave. and Grand Ave./US 60, turn right onto Grand Ave./US 60. In 2.3 mi., turn right onto Greenway Blvd. Cross railroad and turn left onto W. Santa Fe Dr. In 0.3 mi., turn right onto N. Nash St. In 0.8 mi., road becomes RH Johnson Blvd. Cross Bell Rd. In 0.3 mi., turn left onto W. Whispering Oaks Dr. In 0.5 mi., turn left onto N. Spanish Garden Dr. In 0.8 mi., turn left onto W. Aleppo Dr. In 0.6 mi., turn left onto W. Summerstart Dr. In 0.9 mi., turn left onto Meeker Blvd. In 0.1 mi., at light, turn right onto Grand Ave./US 60 and rejoin route.
To get updates here is a link:
http://azdot.gov/projects/phoenix-metro-area/us-60-(grand-ave)-and-bell-road-interchange/construction-updates