Author Topic: TransAmerica Trail #6 map 62 - road construction May - October 2016  (Read 3725 times)

0 Members and 1 Guest are viewing this topic.

Offline CMajernik

SR 230 from turn A to Riverside, WY is under construction. This ten miles has been ripped up and will be repaved. It's rideable but it feels like riding on a rumble strip. The shoulder is ripped up asphalt that has been tamped down with loose and large gravel. Ride carefully and consider hitching a ride in a pickup if possible. The construction project will be completed October 2016.
Carla Majernik
Routes and Mapping Program Director

Adventure Cycling Association
Inspiring people of all ages to travel by bicycle.
800/755-2453, 406/721-1776 x218, 406/721-8754 fax
www.adventurecycling.org

Follow Routes & Mapping on Twitter: @acaroutes