Author Topic: Southern Tier #5 Panels 69- 70 - bridge construction and reroute - April 2022  (Read 4120 times)

0 Members and 1 Guest are viewing this topic.

Offline mmoser

The bridge over Trinity River (between Dolen and Romayor) is being repaired and creating dangerous conditions for cyclists. Relatively high-speed traffic is down to a single narrow lane with concrete/guard rail barriers on either side. Completion date is unknown. The construction zone is just over a mile long.

Here is a reroute between Coldspring and Kountze to get around that area: https://ridewithgps.com/routes/39280744

If you continue on the original route, use extreme caution through this construction area, or if you can, find a ride through the construction.
« Last Edit: June 07, 2022, 11:27:44 am by CMajernik »
**********************
Melissa Moser
GIS Analyst/Cartographer
Routes Dept.
Adventure Cycling Association
Inspiring and empowering people to travel by bicycle.
www.adventurecycling.org